I am so grateful to be able to share the progress of the farmhouse with you!  We have one wall left to have all the outside walls up and standing tall!  I just love going to the job site and smelling the fresh cut wood and listening to the saws and nail guns.  And yes, they do still do some good old hammering with muscles behind it!  I am really getting a good idea now of what the rooms will look like.  With the size and placements of the windows. For the first time I realized I hadn’t taken any pictures from the back of the house.  So there is one today.  The wall that hasn’t gone up yet is the back patio wall.  That wall will have 3 sets of French doors across it.  So hopefully when you walk in the front door you will be able to see all the way through the back patio, to the yard and pool, and the pasture behind that!  Don’t worry, Gary will be keeping it green for us!

The last picture is the east wall of the house.  The septic tank is on that side.  The air conditioning units will also be on the east side of the house.

Well this should be a big week at Sweet Flower Home for the farmhouse progress!   I will be posting the outside elevations of the house within the week too!

Thanks for stopping by!